Our Profile

Commenced its operations in 1993, Cikarang Listrindo became the longest operating Independent Power Producer (IPP) in Indonesia, with installed capacity of 1,144MW. Cikarang Listrindo serves PLN and the 5 (five) Industrial Estates which as an integrated area, is one of the largest and most developed industrial estate area in Indonesia.

1993

1996

1998

2000

2006

2009

2011

2012

2014

2015

2016

2017

2018

2019

Our Journey

1993

The first two GE Frame 6B gas turbines were installed in 1993 and provided a plant capacity of 60 MW.

1996

In 1996 the company added another four GE Frame 6B gas turbines and increased the capacity to 180MW.

1998

In 1998 Cikarang Listrindo added two Mitsubishi steam turbines, each capable of delivering 60 MW. By building two combined-cycle blocks, each consisting of three gas turbines, three heat recovery steam generators and one steam turbine, the total capacity reached 300 MW.

2000

In 2000 Cikarang Listrindo was awarded ISO 9001 Quality Management System certification

2006

In 2006 a GE Frame 9E gas turbine was added, delivering 109 MW and increasing the plant total capacity to 409 MW.

2009

After adding another GE Frame 9E gas turbine in 2009, Cikarang Listrindo was able to produce a total capacity of 518 MW: another milestone in utilizing superior technology and providing customers with world-class quality power supply.

2011

In 2011 Cikarang Listrindo added two Alstom heat recovery steam generators and one Siemens 128 MW steam turbine to operate in combined-cycle mode with the two GE Frame 9E gas turbines and bring the plant capacity to 646 MW.

2012

In 2012 the addition of a third GE Frame 9E gas turbine increased the available power to 755 MW.

2014

In 2014 Cikarang Listrindo was awarded ISO 14001 Environment Management System and OHSAS 18001 Health and Safety Management System certification.

2015

In 2015 a second power plant, which is located in Megalopolis Manunggal 2100 Industrial Town, delivered a plant capacity of 109 MW. This raised the total capacity of the two interconnected plants to 864 MW.

2016

In 2016 Cikarang Listrindo completed a US$272 million IPO on the IDX. Moreover, the Company achieved a record-breaking high of 1 million KVA contracted capacity in the same year.

2017

In 2017 the coal-fired power plant in Babelan was installed with two Valmet (circulating fluidized bed) boilers and two Siemens steam turbines delivering a plant capacity of 280 MW, and increasing the total capacity of the three interconnected plants to 1,144 MW. The coal-fired power plant in Babelan is connected to the 150kV transmission line of over 30km.

2018

Initial phase of renewable power plant with solar rooftop pilot project at 52.5kWp.

2019

In 2019, Cikarang Listrindo started commercial supply of renewable energy sources through the solar rooftop option to customers and explored the possibility of renewable energy power plant development on coal-fired power plant (CFPP) through a pilot project.

Vision

Become a world-class power producer.

Mission

To excel in the electricity supply industry with good teamwork to meet our customers’ needs for safe, reliable, clean and efficient power in a friendly and professional manner.

Service

  • Helping Others
  • Caring
  • Sincerity
Learn More

Trustworthiness

  • Mutual Respect
  • Engagement
  • Synergy
  • Honest
Learn More

Accountability

  • Commitment
  • Totality
  • Walk the Talk
  • Responsibility
Learn More

Reliability

  • Disciplined
  • Diligent
  • Responsive
Learn More

Learn more about our
Organization Structure

Learn More

Board of Commissioners

Sutanto Joso
President Commissioner
Fenza Sofyan
Commissioner
Djeradjat Janto Joso
Commissioner
Iwan P. Brasali
Commissioner
Ir. Kiskenda Suriahardja
Independent Commissioner
Drs. Irwan Sofjan
Independent Commissioner
Drs. Josep Karnady
Independent Commissioner

Board of Directors

Andrew K. Labbaika
President Director
Png Ewe Chai
Vice President Director
Matius Sugiaman
Commercial Director
Richard N. Flynn
Technical Director
Christanto Pranata
Financial Director

Awards & Certifications

Quality Management System Certificate
ISO 9001:2015

Valid until
14 September 2021

Year 2018

Environmental Management System Certificate
ISO 14001:2015

Valid until
23 October 2023

Year 2020

Occupational Health and Safety Management System Certification
ISO 45001:2018

Valid until
10 November 2023

Year 2020

Certification of Occupational Health and Safety Management System

Year 2017

Multi-Site Assurance Statement on the Greenhouse Gas Emissions Inventory Report
ISO 14064-1:2018

Year 2021

Assurance Statement on the Greenhouse Gas Emissions Inventory Report of GSPP Jababeka and GFPP MM-2100
ISO 14064-1:2006

Year 2020

Assurance Statement on the Greenhouse Gas Emissions Inventory Report of CFPP Babelan
ISO 14064-1:2006

Year 2020

Zero Accident Award

Year 2019

Zero Accident Award

Year 2018

Blue-Rating PROPER Award
Period 2019-2020

Year 2020

Blue-Rating PROPER Award
Period 2018-2019

Year 2019

Appreciation for the Participation on the Electricity Safety

Year 2018

2020 CSR Award Certificate

Year 2020

Indonesia Most Admired CEO 2020

Year 2020

Bisnis Indonesia Award 2020
“Resilience in Pandemic”

Year 2020

CSR Jabar Caang Award Certificate

Year 2020

Best CSR for Indonesia CSRxPKBL Award

Year 2020

Annual Financial Statements Award

Year 2019

Indonesia Best Public Companies Award

Year 2018

The 11th IICD Corporate Governance Conference & Award

Top 50 Big Capitalization Public Listed Company

Year 2019

The 10th IICD Corporate Governance Conference & Award

Top 50 Big Capitalization Public Listed Company

Year 2018

The 2nd Indonesia Corporate Secretary Award

Top 3 Good Corporate Governance Issues in Energy Sector

Year 2018

Indonesia Corporate Secretary Award
Top 5 GCG Issues in Energy Sector

Year 2017

The Best Growth Customer

Year 2018

The 13th National Quality & Productivity Workshop

Year 2019

Gold Medal at the Kaizen Forum Indonesia Quality Convention

Year 2017

Gold Medal at the Forum of PSS and PDCA TULTA Indonesia Quality Convention

Year 2016