Our Profile
Commenced its operations in 1993, Cikarang Listrindo became the longest operating Private Power Utility (PPU) in Indonesia, with conventional power plant and solar power generation installed capacity of reached 1,144 MW and 21.2 MWp, respectively. Cikarang Listrindo serves PLN and the 5 (five) Industrial Estates which as an integrated area, is one of the largest and most developed industrial estate area in Indonesia.
1993
1996
1998
2000
2006
2009
2011
2012
2014
2015
2016
2017
2018
2019
2021
2022
2023
1993
The first two GE Frame 6B gas turbines were installed in 1993 and provided a plant capacity of 60 MW.
1996
In 1996 the company added another four GE Frame 6B gas turbines and increased the capacity to 180MW.
1998
In 1998 Cikarang Listrindo added two Mitsubishi steam turbines, each capable of delivering 60 MW. By building two combined-cycle blocks, each consisting of three gas turbines, three heat recovery steam generators and one steam turbine, the total capacity reached 300 MW.
2000
In 2000 Cikarang Listrindo was awarded ISO 9001 Quality Management System certification
2006
In 2006 a GE Frame 9E gas turbine was added, delivering 109 MW and increasing the plant total capacity to 409 MW.
2009
After adding another GE Frame 9E gas turbine in 2009, Cikarang Listrindo was able to produce a total capacity of 518 MW: another milestone in utilizing superior technology and providing customers with world-class quality power supply.
2011
In 2011 Cikarang Listrindo added two Alstom heat recovery steam generators and one Siemens 128 MW steam turbine to operate in combined-cycle mode with the two GE Frame 9E gas turbines and bring the plant capacity to 646 MW.
2012
In 2012 the addition of a third GE Frame 9E gas turbine increased the available power to 755 MW.
2014
In 2014 Cikarang Listrindo was awarded ISO 14001 Environment Management System and OHSAS 18001 Health and Safety Management System certification.
2015
In 2015 a second power plant, which is located in Megalopolis Manunggal 2100 Industrial Town, delivered a plant capacity of 109 MW. This raised the total capacity of the two interconnected plants to 864 MW.
2016
In 2016 Cikarang Listrindo completed a US$272 million IPO on the IDX. Moreover, the Company achieved a record-breaking high of 1 million KVA contracted capacity in the same year.
2017
In 2017 the coal-fired power plant in Babelan was installed with two Valmet (circulating fluidized bed) boilers and two Siemens steam turbines delivering a plant capacity of 280 MW, and increasing the total capacity of the three interconnected plants to 1,144 MW. The coal-fired power plant in Babelan is connected to the 150kV transmission line of over 30km.
2018
Initial phase of renewable power plant with rooftop solar power pilot project at 52.5kWp.
2019
In 2019, Cikarang Listrindo started commercial supply of renewable energy sources through the solar rooftop option to customers and explored the possibility of renewable energy power plant development on coal-fired power plant (CFPP) through a pilot project.
2021
In 2021, Cikarang Listrindo completed the installation of biomass handling system in one of its boilers in the CFPP Babelan, which allows us to utilize a larger portion of biomass fuel up to 20% of boiler capacity. Furthermore, the Company also managed to complete the electric vehicle charging station pilot project in the Company’s operation area.
2022
In 2022, the Company expanded its Rooftop Solar Power capacity to 12.5 MWp from 52.5 kWp in 2019. Additionally, the Company achieved an upgrade in its PROPER performance from Blue PROPER to Green PROPER rating bestowed by the Ministry of Environment and Forestry for GSPP Jababeka and managed to maintain Blue PROPER for CFPP Babelan.
2023
In order to support the Government’s program in accelerating electric vehicle infrastructure, the Company has started its commercial pilot project to provide electric vehicle infrastructure, namely Public Electric Vehicle Charging Stations (Public EVCS), in industrial estates served by the Company. As of December 2023, the Company has successfully launched 2 (two) Public EVCS, each located at EJIP and MM-2100.
Vision
Become a world-class power producer.
Mission
To excel in the electricity supply industry with good teamwork to meet our customers’ needs for safe, reliable, clean and efficient power in a friendly and professional manner.
Service
- Helping Others
- Caring
- Sincerity
Trustworthiness
- Mutual Respect
- Engagement
- Synergy
- Honest
Accountability
- Commitment
- Totality
- Walk the Talk
- Responsibility
Reliability
- Disciplined
- Diligent
- Responsive